The roof has been leveled out as much as I’m capable of (or as much as I can be bothered doing!). The roof used to have a sunroof, so we spent quite some time getting it all perfect.
Now that that is done, we’ve started laying the glass. The mold will be in three parts, hence the flange for the join sticking up into the air.


Tomorrow night we can remove the support for the fence, and lay up the other part of the roof, and the A-pillars.